sgrizzle

Conversion to 2-way from 3rd to 10th to start later this month. Whole project, including utility relocation, to take 465 days. Cosmetic upgrades (similar to the main mall) to be done from 3rd to 7th.

Maybe this link will work:
http://www.tulsaworld.com/PDFDirector.asp?Date=4/11/2006&Edition=1&PDFSeq=11